SF – Oakland Bay Bridge – YBI Transition Structure

The Yerba Buena Island Transition Structure (YBITS) construction for the SF-Oakland Bay Bridge is now complete. It connects the Self-Anchored Suspension (SAS) span to Yerba Buena Island (YBI), and transitions the East Span’s side-by-side road decks to the upper and lower decks of the YBI tunnel and West Span. SDI was contracted to furnish and install all post-tensioning for the project.

sdi_schwager_davis_san_jose_construction_engineering_pt_stay_cables_retrofit_transit
© 1996 - 2020 Schwager Davis, Inc. All Rights Reserved.
Website by
© 1996 - 2020 Schwager Davis, Inc.
All Rights Reserved.
Website by