Golden Pass LNG Project in Texas

Construction of the $2 billion Golden Pass LNG Receiving Terminal has been completed in the Texas Gulf Coast, led by design-build contractor Chicago Bridge & Iron Company. Underwritten by ExxonMobil Corporation, the terminal processes 15.6 million tons of liquefied natural gas per year, or 2 billion cu ft per day.

The project included two ship unloading berths; five full-containment concrete LNG storage tanks, each with a capacity of 155,000 cubic meters; a regassification & sendout system; and related ancillary structures and systems. Schwager Davis, Inc. supplied and installed the grouted post-tensioning system for the five LNG storage tanks.

sdi_schwager_davis_san_jose_construction_engineering_pt_stay_cables_retrofit_transit
© 1996 - 2020 Schwager Davis, Inc. All Rights Reserved.
Website by
© 1996 - 2020 Schwager Davis, Inc.
All Rights Reserved.
Website by